Bulkhead Repair at Bay-Klein / Happy Harbour

Funding

Budget Expenditures
Encumbrances Budget Remaining
Fiscal Year 13-14
$20,000



Fiscal Year 14-15




Total
$20,000


$20,000

Project Description
This project will fund the installation of bulkhead repairs for the bulkheads along the Happy Harbor/Klein Retreat properties.  The existing bulkheads are deteriorating and water is now getting around them and causing erosion on the backside.  The project scope includes placing additional rip rap on the bayside and excavating along the eroded areas and filling with rip rap to stabilize it.  This project is partially funded by the General Fund ($12,000) as well the Hotel Motel Fund. 

First Quarter FY 14-15
Public Works moving excess clean concrete debris to establish erosion control prior to bulkhead construction. 

Second Quarter FY 14-15
Public Works is placing concrete to establish ultimate bulkhead. Project is 25% complete.