Funding
Fiscal Year 13-14
|
$372,550
|
$32,500
|
|
|
Fiscal Year 14-15
|
|
$212,000
|
|
|
Total
|
$372,550
|
$244,500
|
|
$128,050
|
Project Description
The water storage tank at Spencer Highway and Bay Area Boulevard is approximately 35 years old. The tank was most recently inspected in 2009 and the replacement of the tank has been deferred for several years since that time. This project funds the replacement of this structure with a welded steel, multi-plate tank that is estimated to have more than 4 times the life of the current bolted steel tank.
Future Operating Impact
This project is a replacement of a current irrigation system. Savings in maintenance costs will be realized with a newer system.
First Quarter FY 14-15
Project is completed.